A submittable TDEC CN-1249 (Rev. 07-24) Stormwater Pollution Prevention Plan for at-grade single-family lots - pre-filled from a few quick questions.
β Eligibility
Does this lot require mass grading? *
CN-1249 is only for at-grade lots. It is NOT valid if mass grading (significant cut/fill or earthwork beyond foundations, the building pad, and utility trenching) is required.
This lot isn't eligible for the CN-1249 homebuilder SWPPP. Mass grading requires a full contractor SWPPP (engineered or non-engineered).
Switch to the contractor SWPPP β
Is this lot inside a development, or standalone? *
Heads up: a standalone single lot usually only needs permit coverage if it disturbs 1 acre or more, or is part of a larger common plan of development totaling an acre or more. If your lot is under an acre and not part of a larger plan, you may not need a SWPPP at all. You can still generate one (some lenders or local programs ask for it), but verify with TDEC before relying on it.
β‘ Project & builder
Subdivision name *
Required
Subdivision CGP Tracking No. *
The developer's existing permit tracking number for the subdivision (on the common-plan Notice of Coverage).
Required for lots inside a development
Subdivision location *
Required
County *
Required
Receiving water *
Nearest stream/river/lake or storm sewer. Check TDEC DataViewers if unsure.
Required
Builder name *
Required
Builder mailing address *
Required
Lot number(s) *
List every lot this SWPPP covers.
Required
Description of project optional
Plat map *
TDEC requires a plat map showing your lot(s) and the proposed BMPs. Upload it here - it must be attached for a complete submission.
A plat map is required
β’ Site BMPs
Select the erosion-prevention and sediment controls you'll use. Standard CN-1249 descriptions for each are included in your SWPPP.
Select at least one BMP
π‘ Most lots need at least one stabilization practice (mulch, temporary seeding, or permanent seeding/sod) to reach final stabilization. Consider adding one.
β£ Materials on site (Part VI)
Check materials expected on site during construction. These are marked on the SWPPP's materials inventory.
β€ Certification names
Owner / Developer name (Primary Permittee) *
The developer or owner of the subdivision who holds the permit.
Required
Contractor / Builder name (Secondary Permittee) *
Required
β₯ Your SWPPP
Homebuilder SWPPP
$99
Submittable CN-1249 (Rev. 07-24) for single-family residential homebuilding.
β Pre-filled CN-1249 Part I cover β Primary & Secondary certifications β Standard 9-step construction sequence β BMP descriptions for your selected controls β Timing, maintenance & twice-weekly inspection procedures β Materials inventory + spill prevention β Formatted to match the TDEC form, page-for-page
Email (where we send your SWPPP) *
Enter a valid email
Generated from your inputs. You are responsible for verifying all information and complying with TN NPDES General Permit TNR100000 before submission.