* Required · Answers save automatically as you type.
Upload your site map or EPSC plan. This is required for a field-ready SWPPP. If you have stamped engineer plans, upload them here to unlock all BMPs.
This is required for a field-ready SWPPP. PDF, JPG, or PNG. If you don't have one yet, you can still generate a draft and add it later.
Tell us how stormwater leaves your site and where it ends up. This determines what controls are required and whether enhanced design is needed.
Check every type of work planned. Your SWPPP will only include pollution prevention sections for what you select - so check everything that applies.
Your SWPPP only includes pollution prevention sections for items marked Yes - so only answer Yes if it actually applies.
Select every control that will be on your site. Controls that require approved plans are marked - if you're on the non-engineered path, those are grayed out.
Enter the companies and people on this job first - they populate the Installed by and Maintained by dropdowns when you assign each control below. Installed-by is usually a contractor; permanent-control maintenance is usually the owner. Every field stays editable.
For each control - enter location, who installs it, who maintains it, and when it comes down. All fields are required for field-ready output. Missing fields will block final generation.
Confirm the primary permittee and the required 24-hour emergency and BMP-maintenance contacts. The owner, inspector, and contractors are entered in Step 5 - these all flow into your responsibility matrix and certification pages.
Inspector info is pre-filled from Step 6. The TN CGP requires inspections at least twice per calendar week (at least 72 hours apart) and within 24 hours of any storm event of 0.5 inches or more.
Confirm which pollution sources are on your site. We only generate prevention sections for what's actually there - so a simple job stays simple.
How will the site be permanently stabilized, and who closes out the permit? Final stabilization means 70% uniform vegetative cover on all disturbed unpaved areas.
Review your completion status below. You'll see exactly what's ready, what's missing, and what output you'll get before you pay.
NOI confirmation, Notice of Coverage, ARAP/404 permits, or other project documents. These appear in Appendix A of your SWPPP.
Download the official TDEC NOI form (CN-0940) and the SWPPPBuilder pre-filled worksheet. Submit the official form through MyTDEC before construction begins.
You must read and check this box before generating your SWPPP.