1
Project
2
Site
3
Operator
4
Review
Step 1 of 4

Project basics

This information appears on the cover page and Section 1 of your SWPPP.

Please enter a project name
Required
Required
Required
Required
Please select a project type
Required
Required
Step 2 of 4

Site conditions

This drives your runoff calculations, BMP selection, and drainage narrative.

Acreage

Total parcel area
Required
Area actively graded or disturbed
Required
Estimate the average slope across the disturbed area
Required

Soils and land use

Not sure? Check USDA Web Soil Survey at websoilsurvey.usda.gov
Please select a soil group
Required
Required

Receiving waters

The stream or water body that stormwater from this site drains to
Required
Required
Required
Step 3 of 4

Operator information

The primary operator is the owner or developer responsible for the permit. This appears on the certification and signature pages.

Required
Required
Required
Required
Required

Who is the primary operator?
The primary operator is typically the land owner or developer with overall project control. General contractors are secondary permittees and sign a separate certification page included in your SWPPP.
Step 4 of 4

Review and generate

Review your project details before generating your Tennessee SWPPP.

Project basics Edit
-
-
-
-
-
-
Site conditions Edit
-
-
-
-
-
-
-
-
Operator Edit
-
-
-
-
Tennessee NPDES Permit No. TNR100000
Your SWPPP will be generated for Tennessee under the current Construction General Permit. Sites draining 10+ acres to a single outfall require engineering design by a licensed PE. SWPPPBuilder documents are calculation worksheets, not PE-stamped designs.

We'll email you a copy so you always have it. No spam — ever.